• banner

Water Tank Coating Factory – Hardware parts dusting production line – Jinming

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

With our excellent management, strong technical capability and strict quality control system, we continue to provide our clients with reliable quality, reasonable prices and excellent services. We aim at becoming one of your most reliable partners and earning your satisfaction for Powerful Dust Collector, Auto Parts Coating Line, Paint Room Supplies, We welcome clients, enterprise associations and friends from all components from the earth to make contact with us and find cooperation for mutual positive aspects.
Water Tank Coating Factory – Hardware parts dusting production line – Jinming Detail:

Working principle

Working principle: the workpiece powder spraying is electrostatic spraying, the scattered powder can be recovered and reused, so the powder recovery device is set on the side of the powder room. The system adopts the two-stage recovery mode of big cyclone + filter element, which is attracted by the exhaust fan. Some ultrafine powder is filtered when flowing through the filter element with the airflow, and then discharged from the workshop with the discharged air.

1. The powder spraying room is processed with galvanized steel plate of δ1.5mm, and the panels are connected with bolts after folding to ensure that the panels are smooth and crisp; D =120mm strip opening is arranged at the top of the chamber body to make the suspension conveying system run outside the chamber without being polluted by dust.

2. A set of lighting lamps is set on both sides of the powder chamber body, and the lamps are 40W×2 double tube triple anti-fluorescent lamp, which is installed on the top of the operating port.

Dusting paint painting production line1
Dusting paint painting production line2
Dusting paint painting production line3

The powder room is equipped with a set of recovery device, recovery method is big cyclone + filter dual-stage recovery, mainly including big cyclone, filter element, pulse solenoid valve and pulse controller, powder collection box, exhaust fan, etc.; Exhaust fan selection OF BTHF-№630A centrifugal fan, the main technical parameters of the fan: air volume 15500 m³/h, full pressure 2000Pa, speed 2900r/min, motor power 18.5kW.

3. Spraying device
Powder room is equipped with 2 sets of manual spraying machine, high voltage electrostatic spraying machine made in Shanghai spraying machine.

4. Powder room partition: (optional)
During powder spraying, the scattered dust will pollute the surrounding environment to some degree, so a powder room is set up to close and partition, and the workpiece passing through is made into a imitation door. The partition wall is arranged with appropriate glass Windows for lighting, and the partition wall is made of δ50mm rock wool sandwich color board and single layer color board, with beautiful appearance.

According to the workpiece size, other models can be customized.


Product detail pictures:

Water Tank Coating Factory –  Hardware parts dusting production line – Jinming detail pictures


Related Product Guide:

We take "customer-friendly, quality-oriented, integrative, innovative" as objectives. "Truth and honesty" is our administration ideal for Water Tank Coating Factory – Hardware parts dusting production line – Jinming , The product will supply to all over the world, such as: Salt Lake City, Spain, Jakarta, Our company will adhere to "Quality first, , perfection forever, people-oriented , technology innovation"business philosophy. Hard work to keep making progress, innovation in the industry, make every effort to first-class enterprise. We try our best to build the scientific management model, to learn abundant professional knowledge, to develop advanced production equipment and production process , to create the first-call quality products, reasonable price , high quality of service , quick delivery , to give you create new value .
  • It's really lucky to find such a professional and responsible manufacturer, the product quality is good and delivery is timely, very nice.
    5 Stars By Jean Ascher from Egypt - 2017.08.18 18:38
    The customer service reprersentative explained very detailed, service attitude is very good, reply is very timely and comprehensive, a happy communication! We hope to have a opportunity to cooperate.
    5 Stars By Poppy from Jordan - 2017.01.11 17:15
    Write your message here and send it to us

    Related products

    • Paint Room Supplies Supplier –  Integral mobile spray paint room – Jinming

      Paint Room Supplies Supplier – Integral...

      The chamber body The chamber body is composed of skeleton, wall panel, electric rolling curtain door, lighting system, safety side door and other parts. The chamber body is through type, the whole chamber body skeleton structure is welded into one, forming a steel frame structure, and through anti-rust treatment; The chamber wall panel is assembled structure, all the panels are made of 1.2mm galvanized sheet folding assembly; The wrapping Angle is the whole galvanized sheet bending formi...

    • China Dust Control Filter –  Filter cartridge bag dust collector – Jinming

      China Dust Control Filter – Filter cart...

      Introduction PL series single machine dust removal equipment is the domestic more dust removal equipment, the equipment by fan, filter type filter, dust collector trinity. The filter barrel of the PL single-machine bag filter is made of imported polyester fiber, which has many advantages such as high dust removal efficiency, fine dust collection, small size, convenient installation and maintenance, long service life and so on. PL series single machine dust collector in the equipment...

    • China Coating Spray Equipment Factory –  Auto automatic robot paint room – Jinming

      China Coating Spray Equipment Factory – ...

      Introduction According to the properties of coating production, it can be divided into intermittent production and continuous production. Intermittent production spray room is mainly used for single or small batch of workpiece painting operation, can also be used for large batch of small workpiece painting operation. Its form according to the workpiece placement way has the table, the suspension type, the table mobile three. Intermittent production of spray room for semi-open, continuous...

    • High Quality Pre-Treatment Equipment –  Automatic powder spraying production coating line – Jinming

      High Quality Pre-Treatment Equipment – ...

      Introduction This is a set of economical big cyclone two stage recovery and dusting system, powder recovery efficiency is high, cleaning and changing color is convenient and fast, the equipment is durable. Spray room side plate and roof adopts stainless steel plate, spray room design has 4 automatic gun openings, spray gun using erect cloth gun. The system is equipped with two manual injection stations for online detection and manual injection of complex workpieces. Big cyclone adopts Eu...

    • China Pocket filter –  RTO regenerative waste gas incinerator – Jinming

      China Pocket filter – RTO regenerative ...

      Introduction RT0 is also known as regenerative heating garbage incinerator, is a kind of environmental protection machinery that depends on heat energy to immediately ignite the waste gas, which can solve the waste gas in spraying, painting, packaging and printing, plastics, chemical plants, electrophoresis principle, spraying, electronic devices and other basically all fields. For the waste gas with the concentration value in the range of 100-3500mg /m3, RTO has the practical effect tha...

    • High Quality Powder Spraying Exporters –  Water rotary spray paint roomS-1600 – Jinming

      High Quality Powder Spraying Exporters – ...

      Introduction Water spray paint room, also known as Wenshi spray paint room, is to solve the water circulation system of the original water spray paint room often blocked. After the outdoor air is purified by the filter material at the top of the spray room, it enters the spray room, flows through the workpiece and the operator from top to bottom, and then the exhaust gas containing particulate matter generated in the work is quickly led to the water rotor below the floor grid due to the ...