• banner

Room By Room Heating Factories – Passenger car professional rain test test room JM-900 – Jinming

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We are commitment to offer you the aggressive price tag ,exceptional products and solutions high-quality, as well as fast delivery for Powder Coating Pretreatment Chemicals, Pretreatment Electrophoresis, Diy Woodworking Dust Collection, We welcome new and old customers from all walks of life to contact us for future business relationships and mutual success!
Room By Room Heating Factories – Passenger car professional rain test test room JM-900 – Jinming Detail:

Introduction

The equipment is used for the vehicle sealing inspection, rain, dry room for through type. The water is continuously pumped into the main pipeline from the reservoir, through pressure regulation and flow regulation into the rain pipeline, shot to the surface of the car body through the nozzle, the ejected water is collected into the reservoir, after precipitation filtration, recycling. During the inspection, all doors and Windows are closed, and the driver drives the car in and passes through the rain chamber and the blow-drying chamber in turn. The rain duration is adjustable from 3-15min. Vehicle rain test requirements of the top, before and after, around and at the bottom, rain, dry in the indoor, rain laboratory, dry chamber body with stainless steel plate, the surface of the chamber body is stainless steel plate material, the outer surface is anti-rust coating, rain chamber, dry chamber import and export do not set a closed door. The rain and blow-drying room is mainly composed of rain room, blow-drying room, circulating reservoir, water supply system of pump, backwater system, filtration system, rain system (nozzle can be replaced), blow-drying system and electronic control system.

Operation button set manual and automatic operation, can be manually forced water pump and fan work.

Rain zone: spray the body surface with a certain intensity of rain. At the same time, the sewage treatment device is set up to filter the circulating water and make it reach the standard of circulating water.

Vehicle rain test room L-900-2
Vehicle rain test room L-900-3
Vehicle rain test room L-900-1

Rain seal test by induction switch control rain, rain time can be set delay.

The flow of the rain piping system is adjustable, and the outlet pressure of the pump is adjustable. The rain system adopts circulating water, with filtration (stainless steel filter, to ensure that no sand with the flow of water spray injured body paint), drainage function. There are ditches on the road in the whole test area that are communicated with the rainwater chamber reservoir. The road slopes to the center line about 2° on both sides (high on both sides and low in the middle). The water flowing from the car body flows to the ditch from the ground and then returns to the rainwater chamber reservoir.

Used for vehicle rain test, other models support customization.


Product detail pictures:

Room By Room Heating Factories –  Passenger car professional rain test test room JM-900 – Jinming detail pictures


Related Product Guide:

Our firm sticks to the basic principle of "Quality is the life of your company, and status will be the soul of it" for Room By Room Heating Factories – Passenger car professional rain test test room JM-900 – Jinming , The product will supply to all over the world, such as: Guyana, Canada, Holland, To work with an excellent items manufacturer, our company is your best choice. Warmly welcome you and opening up the boundaries of communication. We are the ideal partner of your business development and look forward to your sincere cooperation.
  • The factory workers have a good team spirit, so we received high quality products fast, in addition, the price is also appropriate, this is a very good and reliable Chinese manufacturers.
    5 Stars By Ida from Vancouver - 2017.06.25 12:48
    The factory has advanced equipment, experienced staffs and good management level, so product quality had assurance, this cooperation is very relaxed and happy!
    5 Stars By Karl from Doha - 2017.10.25 15:53
    Write your message here and send it to us

    Related products

    • High Quality Equipment Spray Paint –  Hardware parts dusting production line – Jinming

      High Quality Equipment Spray Paint – Ha...

      Working principle Working principle: the workpiece powder spraying is electrostatic spraying, the scattered powder can be recovered and reused, so the powder recovery device is set on the side of the powder room. The system adopts the two-stage recovery mode of big cyclone + filter element, which is attracted by the exhaust fan. Some ultrafine powder is filtered when flowing through the filter element with the airflow, and then discharged from the workshop with the discharged air. 1. The...

    • China Artificial Powder Spraying Line Factory –  Water rotary spray paint roomS-1600 – Jinming

      China Artificial Powder Spraying Line Factory &...

      Introduction Water spray paint room, also known as Wenshi spray paint room, is to solve the water circulation system of the original water spray paint room often blocked. After the outdoor air is purified by the filter material at the top of the spray room, it enters the spray room, flows through the workpiece and the operator from top to bottom, and then the exhaust gas containing particulate matter generated in the work is quickly led to the water rotor below the floor grid due to the ...

    • High Quality 1.5 Hp Dust Collector Factory –  Zeolite wheel adsorption concentration – Jinming

      High Quality 1.5 Hp Dust Collector Factory R...

      Basic principles The basic principle of zeolite wheel structure  The concentration zone of zeolite runner can be divided into treatment zone, regeneration zone and cooling zone. The concentration runner runs continuously in each zone. VOC organic exhaust gas passes through the pre-filter and through the treatment area of the concentrator runner unit. In the treatment area, VOCs are removed by adsorbent adsorption, and the purified air is discharged from the treatment range of the co...

    • High Quality Environmental Protection And Pollution Exporters –  Activated carbon adsorption, desorption, catalytic combustion – Jinming

      High Quality Environmental Protection And Pollu...

      Introduction Workshop is engaged in the production operation will poduce the harmful gas such as stimulation of pollutants, to nature ecology and plant environmental hazards can cause air pollution, waste gas emissions from the equipment will be collected, the use of activated carbon adsorption tower will be treated as waste gas to the air pollutant emission standards before discharge into the atmosphere, so as not to ause the harm of environment and staff. Activated carbon abs...

    • China Artificial Powder Spraying Line Factories –  Hardware parts dusting production line – Jinming

      China Artificial Powder Spraying Line Factories...

      Working principle Working principle: the workpiece powder spraying is electrostatic spraying, the scattered powder can be recovered and reused, so the powder recovery device is set on the side of the powder room. The system adopts the two-stage recovery mode of big cyclone + filter element, which is attracted by the exhaust fan. Some ultrafine powder is filtered when flowing through the filter element with the airflow, and then discharged from the workshop with the discharged air. 1. The...

    • High Quality Workshop Dust Extraction Systems Suppliers –  Activated carbon adsorption, desorption, catalytic combustion – Jinming

      High Quality Workshop Dust Extraction Systems S...

      Introduction Workshop is engaged in the production operation will poduce the harmful gas such as stimulation of pollutants, to nature ecology and plant environmental hazards can cause air pollution, waste gas emissions from the equipment will be collected, the use of activated carbon adsorption tower will be treated as waste gas to the air pollutant emission standards before discharge into the atmosphere, so as not to ause the harm of environment and staff. Activated carbon abs...