• banner

Powder Coating Spray Exporters – Passenger car professional rain test test room JM-900 – Jinming

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Our well-equipped facilities and exceptional good quality manage throughout all stages of production enables us to guarantee total shopper satisfaction for 3 D Car, Powder Coating Machine, Paint And Equipment, Create Values,Serving Customer!" would be the purpose we pursue. We sincerely hope that all clients will build long-lasting and mutually effective cooperation with us.In the event you wish to get extra facts about our enterprise, Be sure to get in touch with with us now.
Powder Coating Spray Exporters – Passenger car professional rain test test room JM-900 – Jinming Detail:

Introduction

The equipment is used for the vehicle sealing inspection, rain, dry room for through type. The water is continuously pumped into the main pipeline from the reservoir, through pressure regulation and flow regulation into the rain pipeline, shot to the surface of the car body through the nozzle, the ejected water is collected into the reservoir, after precipitation filtration, recycling. During the inspection, all doors and Windows are closed, and the driver drives the car in and passes through the rain chamber and the blow-drying chamber in turn. The rain duration is adjustable from 3-15min. Vehicle rain test requirements of the top, before and after, around and at the bottom, rain, dry in the indoor, rain laboratory, dry chamber body with stainless steel plate, the surface of the chamber body is stainless steel plate material, the outer surface is anti-rust coating, rain chamber, dry chamber import and export do not set a closed door. The rain and blow-drying room is mainly composed of rain room, blow-drying room, circulating reservoir, water supply system of pump, backwater system, filtration system, rain system (nozzle can be replaced), blow-drying system and electronic control system.

Operation button set manual and automatic operation, can be manually forced water pump and fan work.

Rain zone: spray the body surface with a certain intensity of rain. At the same time, the sewage treatment device is set up to filter the circulating water and make it reach the standard of circulating water.

Vehicle rain test room L-900-2
Vehicle rain test room L-900-3
Vehicle rain test room L-900-1

Rain seal test by induction switch control rain, rain time can be set delay.

The flow of the rain piping system is adjustable, and the outlet pressure of the pump is adjustable. The rain system adopts circulating water, with filtration (stainless steel filter, to ensure that no sand with the flow of water spray injured body paint), drainage function. There are ditches on the road in the whole test area that are communicated with the rainwater chamber reservoir. The road slopes to the center line about 2° on both sides (high on both sides and low in the middle). The water flowing from the car body flows to the ditch from the ground and then returns to the rainwater chamber reservoir.

Used for vehicle rain test, other models support customization.


Product detail pictures:

Powder Coating Spray Exporters –  Passenger car professional rain test test room JM-900 – Jinming detail pictures


Related Product Guide:

To become the stage of realizing dreams of our employees! To build a happier, much more united and far more professional team! To reach a mutual profit of our clients, suppliers, the society and ourselves for Powder Coating Spray Exporters – Passenger car professional rain test test room JM-900 – Jinming , The product will supply to all over the world, such as: Juventus, Maldives, Philippines, With the technology as the core, develop and produce high-quality merchandise according to the diverse needs of the market. With this concept,the company will continue to develop merchandise with high added values and continuously improve items,and will present many customers with the best goods and services!
  • Product variety is complete, good quality and inexpensive, the delivery is fast and transport is security, very good, we are happy to cooperate with a reputable company!
    5 Stars By Sharon from Turin - 2018.09.23 18:44
    In China, we have many partners, this company is the most satisfying to us, reliable quality and good credit, it is worth appreciation.
    5 Stars By Stephanie from Bhutan - 2017.05.02 11:33
    Write your message here and send it to us

    Related products

    • High Quality Paint Production Factory Suppliers –  Integral mobile spray paint room – Jinming

      High Quality Paint Production Factory Suppliers...

      The chamber body The chamber body is composed of skeleton, wall panel, electric rolling curtain door, lighting system, safety side door and other parts. The chamber body is through type, the whole chamber body skeleton structure is welded into one, forming a steel frame structure, and through anti-rust treatment; The chamber wall panel is assembled structure, all the panels are made of 1.2mm galvanized sheet folding assembly; The wrapping Angle is the whole galvanized sheet bending formi...

    • Powder Coat Paint Line Factories –  Water rotary spray paint roomS-1600 – Jinming

      Powder Coat Paint Line Factories – Wate...

      Introduction Water spray paint room, also known as Wenshi spray paint room, is to solve the water circulation system of the original water spray paint room often blocked. After the outdoor air is purified by the filter material at the top of the spray room, it enters the spray room, flows through the workpiece and the operator from top to bottom, and then the exhaust gas containing particulate matter generated in the work is quickly led to the water rotor below the floor grid due to the ...

    • Dust Free Spray Booth System Suppliers –  Zeolite wheel adsorption concentration – Jinming

      Dust Free Spray Booth System Suppliers – ...

      Basic principles The basic principle of zeolite wheel structure  The concentration zone of zeolite runner can be divided into treatment zone, regeneration zone and cooling zone. The concentration runner runs continuously in each zone. VOC organic exhaust gas passes through the pre-filter and through the treatment area of the concentrator runner unit. In the treatment area, VOCs are removed by adsorbent adsorption, and the purified air is discharged from the treatment range of the co...

    • High Quality Dry Spray Room Suppliers –  Water rotary spray paint roomS-1600 – Jinming

      High Quality Dry Spray Room Suppliers – ...

      Introduction Water spray paint room, also known as Wenshi spray paint room, is to solve the water circulation system of the original water spray paint room often blocked. After the outdoor air is purified by the filter material at the top of the spray room, it enters the spray room, flows through the workpiece and the operator from top to bottom, and then the exhaust gas containing particulate matter generated in the work is quickly led to the water rotor below the floor grid due to the ...

    • China The Ground Furnace Suppliers –  Environmental protection auto professional paint room-s-700 – Jinming

      China The Ground Furnace Suppliers – En...

      Description of the main structure of the spray paint room The paint room is composed of chamber body, lighting device, air filtration system, air supply system, exhaust system, paint mist treatment system, electric control system, safety protection device and so on. The chamber body Paint chamber chamber body is fully closed structure, mainly composed of wall panels, workpiece entry, pedestrian safety door and bottom grille. Chamber body strength, stability, impact resistance, shoc...

    • High Quality Dust Extraction System Exporters –  Activated carbon adsorption, desorption, catalytic combustion – Jinming

      High Quality Dust Extraction System Exporters &...

      Introduction Workshop is engaged in the production operation will poduce the harmful gas such as stimulation of pollutants, to nature ecology and plant environmental hazards can cause air pollution, waste gas emissions from the equipment will be collected, the use of activated carbon adsorption tower will be treated as waste gas to the air pollutant emission standards before discharge into the atmosphere, so as not to ause the harm of environment and staff. Activated carbon abs...