• banner

Paint Spraying Device Factories – Passenger car professional rain test test room JM-900 – Jinming

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Using a complete scientific top quality management program, great high-quality and fantastic religion, we win great track record and occupied this area for Electrophoresis, Dust Removal Filter, Wood Shop Dust Collection System, Adhering to the business philosophy of 'customer first, forge ahead', we sincerely welcome clients from at home and abroad to cooperate with us.
Paint Spraying Device Factories – Passenger car professional rain test test room JM-900 – Jinming Detail:

Introduction

The equipment is used for the vehicle sealing inspection, rain, dry room for through type. The water is continuously pumped into the main pipeline from the reservoir, through pressure regulation and flow regulation into the rain pipeline, shot to the surface of the car body through the nozzle, the ejected water is collected into the reservoir, after precipitation filtration, recycling. During the inspection, all doors and Windows are closed, and the driver drives the car in and passes through the rain chamber and the blow-drying chamber in turn. The rain duration is adjustable from 3-15min. Vehicle rain test requirements of the top, before and after, around and at the bottom, rain, dry in the indoor, rain laboratory, dry chamber body with stainless steel plate, the surface of the chamber body is stainless steel plate material, the outer surface is anti-rust coating, rain chamber, dry chamber import and export do not set a closed door. The rain and blow-drying room is mainly composed of rain room, blow-drying room, circulating reservoir, water supply system of pump, backwater system, filtration system, rain system (nozzle can be replaced), blow-drying system and electronic control system.

Operation button set manual and automatic operation, can be manually forced water pump and fan work.

Rain zone: spray the body surface with a certain intensity of rain. At the same time, the sewage treatment device is set up to filter the circulating water and make it reach the standard of circulating water.

Vehicle rain test room L-900-2
Vehicle rain test room L-900-3
Vehicle rain test room L-900-1

Rain seal test by induction switch control rain, rain time can be set delay.

The flow of the rain piping system is adjustable, and the outlet pressure of the pump is adjustable. The rain system adopts circulating water, with filtration (stainless steel filter, to ensure that no sand with the flow of water spray injured body paint), drainage function. There are ditches on the road in the whole test area that are communicated with the rainwater chamber reservoir. The road slopes to the center line about 2° on both sides (high on both sides and low in the middle). The water flowing from the car body flows to the ditch from the ground and then returns to the rainwater chamber reservoir.

Used for vehicle rain test, other models support customization.


Product detail pictures:

Paint Spraying Device Factories –  Passenger car professional rain test test room JM-900 – Jinming detail pictures


Related Product Guide:

We'll make every effort and hard work being outstanding and excellent, and speed up our techniques for standing during the rank of global top-grade and high-tech enterprises for Paint Spraying Device Factories – Passenger car professional rain test test room JM-900 – Jinming , The product will supply to all over the world, such as: Bandung, Moldova, Kuwait, You can always find the solutions you have to have in our company! Welcome to inquire us about our product and anything we know and we can help in auto spare parts. We have been looking forward to work with you for a win-win situation.
  • Good quality and fast delivery, it's very nice. Some products have a little bit problem, but the supplier replaced timely, overall, we are satisfied.
    5 Stars By Isabel from Pretoria - 2018.12.05 13:53
    Cooperate with you every time is very successful, very happy. Hope that we can have more cooperation!
    5 Stars By Victor Yanushkevich from Russia - 2017.06.29 18:55
    Write your message here and send it to us

    Related products

    • High Quality Dust Collection Exporters –  Zeolite wheel adsorption concentration – Jinming

      High Quality Dust Collection Exporters – ...

      Basic principles The basic principle of zeolite wheel structure  The concentration zone of zeolite runner can be divided into treatment zone, regeneration zone and cooling zone. The concentration runner runs continuously in each zone. VOC organic exhaust gas passes through the pre-filter and through the treatment area of the concentrator runner unit. In the treatment area, VOCs are removed by adsorbent adsorption, and the purified air is discharged from the treatment range of the co...

    • High Quality Zinc Phosphate Pretreatment –  Environmental protection auto professional paint room-s-700 – Jinming

      High Quality Zinc Phosphate Pretreatment –...

      Description of the main structure of the spray paint room The paint room is composed of chamber body, lighting device, air filtration system, air supply system, exhaust system, paint mist treatment system, electric control system, safety protection device and so on. The chamber body Paint chamber chamber body is fully closed structure, mainly composed of wall panels, workpiece entry, pedestrian safety door and bottom grille. Chamber body strength, stability, impact resistance, shoc...

    • China Quiet Dust Collector Suppliers –  RTO regenerative waste gas incinerator – Jinming

      China Quiet Dust Collector Suppliers – ...

      Introduction RT0 is also known as regenerative heating garbage incinerator, is a kind of environmental protection machinery that depends on heat energy to immediately ignite the waste gas, which can solve the waste gas in spraying, painting, packaging and printing, plastics, chemical plants, electrophoresis principle, spraying, electronic devices and other basically all fields. For the waste gas with the concentration value in the range of 100-3500mg /m3, RTO has the practical effect tha...

    • China Paint Spraying Device Supplier –  Environmental protection auto professional paint room-s-700 – Jinming

      China Paint Spraying Device Supplier – ...

      Description of the main structure of the spray paint room The paint room is composed of chamber body, lighting device, air filtration system, air supply system, exhaust system, paint mist treatment system, electric control system, safety protection device and so on. The chamber body Paint chamber chamber body is fully closed structure, mainly composed of wall panels, workpiece entry, pedestrian safety door and bottom grille. Chamber body strength, stability, impact resistance, shoc...

    • Paint Drying Room Suppliers –  Environmental protection auto professional paint room-s-700 – Jinming

      Paint Drying Room Suppliers – Environme...

      Description of the main structure of the spray paint room The paint room is composed of chamber body, lighting device, air filtration system, air supply system, exhaust system, paint mist treatment system, electric control system, safety protection device and so on. The chamber body Paint chamber chamber body is fully closed structure, mainly composed of wall panels, workpiece entry, pedestrian safety door and bottom grille. Chamber body strength, stability, impact resistance, shoc...

    • China Liquid Painting Line Suppliers –  Hardware parts dusting production line – Jinming

      China Liquid Painting Line Suppliers – ...

      Working principle Working principle: the workpiece powder spraying is electrostatic spraying, the scattered powder can be recovered and reused, so the powder recovery device is set on the side of the powder room. The system adopts the two-stage recovery mode of big cyclone + filter element, which is attracted by the exhaust fan. Some ultrafine powder is filtered when flowing through the filter element with the airflow, and then discharged from the workshop with the discharged air. 1. The...