• banner

High Quality Sublimation Coating Powder Supplier – Passenger car professional rain test test room JM-900 – Jinming

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

It is a great way to further improve our products and repair. Our mission is always to create innovative products to prospects with a superior expertise for The Physical Method, Painting Equipment And Tools, Bucket Dust Collector, We warmly welcome you to establish cooperation and create a bright future together with us.
High Quality Sublimation Coating Powder Supplier – Passenger car professional rain test test room JM-900 – Jinming Detail:

Introduction

The equipment is used for the vehicle sealing inspection, rain, dry room for through type. The water is continuously pumped into the main pipeline from the reservoir, through pressure regulation and flow regulation into the rain pipeline, shot to the surface of the car body through the nozzle, the ejected water is collected into the reservoir, after precipitation filtration, recycling. During the inspection, all doors and Windows are closed, and the driver drives the car in and passes through the rain chamber and the blow-drying chamber in turn. The rain duration is adjustable from 3-15min. Vehicle rain test requirements of the top, before and after, around and at the bottom, rain, dry in the indoor, rain laboratory, dry chamber body with stainless steel plate, the surface of the chamber body is stainless steel plate material, the outer surface is anti-rust coating, rain chamber, dry chamber import and export do not set a closed door. The rain and blow-drying room is mainly composed of rain room, blow-drying room, circulating reservoir, water supply system of pump, backwater system, filtration system, rain system (nozzle can be replaced), blow-drying system and electronic control system.

Operation button set manual and automatic operation, can be manually forced water pump and fan work.

Rain zone: spray the body surface with a certain intensity of rain. At the same time, the sewage treatment device is set up to filter the circulating water and make it reach the standard of circulating water.

Vehicle rain test room L-900-2
Vehicle rain test room L-900-3
Vehicle rain test room L-900-1

Rain seal test by induction switch control rain, rain time can be set delay.

The flow of the rain piping system is adjustable, and the outlet pressure of the pump is adjustable. The rain system adopts circulating water, with filtration (stainless steel filter, to ensure that no sand with the flow of water spray injured body paint), drainage function. There are ditches on the road in the whole test area that are communicated with the rainwater chamber reservoir. The road slopes to the center line about 2° on both sides (high on both sides and low in the middle). The water flowing from the car body flows to the ditch from the ground and then returns to the rainwater chamber reservoir.

Used for vehicle rain test, other models support customization.


Product detail pictures:

High Quality Sublimation Coating Powder Supplier –  Passenger car professional rain test test room JM-900 – Jinming detail pictures


Related Product Guide:

owing to excellent assistance, a variety of top of the range items, aggressive costs and efficient delivery, we take pleasure in a very good standing amongst our shoppers. We've been an energetic corporation with wide market for High Quality Sublimation Coating Powder Supplier – Passenger car professional rain test test room JM-900 – Jinming , The product will supply to all over the world, such as: Danish, Maldives, Palestine, We've got constructed strong and long co-operation relationship with an enormous quantity of companies within this business overseas. Immediate and specialist after-sale service supplied by our consultant group has happy our buyers. In depth Info and parameters from the merchandise will probably be sent to you for any thorough acknowledge. Free samples may be delivered and company check out to our corporation. n Portugal for negotiation is constantly welcome. Hope to get inquiries type you and construct a long-term co-operation partnership.
  • The after-sale warranty service is timely and thoughtful, encounter problems can be resolved very quickly, we feel reliable and secure.
    5 Stars By Louis from Czech - 2017.11.12 12:31
    The sales person is professional and responsible, warm and polite, we had a pleasant conversation and no language barriers on communication.
    5 Stars By Lorraine from United States - 2018.09.16 11:31
    Write your message here and send it to us

    Related products

    • High Quality Chrome Phosphate Pretreatment Factory –  Hardware parts dusting production line – Jinming

      High Quality Chrome Phosphate Pretreatment Fact...

      Working principle Working principle: the workpiece powder spraying is electrostatic spraying, the scattered powder can be recovered and reused, so the powder recovery device is set on the side of the powder room. The system adopts the two-stage recovery mode of big cyclone + filter element, which is attracted by the exhaust fan. Some ultrafine powder is filtered when flowing through the filter element with the airflow, and then discharged from the workshop with the discharged air. 1. The...

    • High Quality Diy Dust Collection System Factory –  Activated carbon adsorption, desorption, catalytic combustion – Jinming

      High Quality Diy Dust Collection System Factory...

      Introduction Workshop is engaged in the production operation will poduce the harmful gas such as stimulation of pollutants, to nature ecology and plant environmental hazards can cause air pollution, waste gas emissions from the equipment will be collected, the use of activated carbon adsorption tower will be treated as waste gas to the air pollutant emission standards before discharge into the atmosphere, so as not to ause the harm of environment and staff. Activated carbon abs...

    • China Electric Dust Collector Suppliers –  Activated carbon adsorption, desorption, catalytic combustion – Jinming

      China Electric Dust Collector Suppliers –...

      Introduction Workshop is engaged in the production operation will poduce the harmful gas such as stimulation of pollutants, to nature ecology and plant environmental hazards can cause air pollution, waste gas emissions from the equipment will be collected, the use of activated carbon adsorption tower will be treated as waste gas to the air pollutant emission standards before discharge into the atmosphere, so as not to ause the harm of environment and staff. Activated carbon abs...

    • China Overhead Dust Collector Factories –  Filter cartridge bag dust collector – Jinming

      China Overhead Dust Collector Factories –...

      Introduction PL series single machine dust removal equipment is the domestic more dust removal equipment, the equipment by fan, filter type filter, dust collector trinity. The filter barrel of the PL single-machine bag filter is made of imported polyester fiber, which has many advantages such as high dust removal efficiency, fine dust collection, small size, convenient installation and maintenance, long service life and so on. PL series single machine dust collector in the equipment...

    • China Thermal Spray Powder Suppliers Exporters –  Water rotary spray paint roomS-1600 – Jinming

      China Thermal Spray Powder Suppliers Exporters ...

      Introduction Water spray paint room, also known as Wenshi spray paint room, is to solve the water circulation system of the original water spray paint room often blocked. After the outdoor air is purified by the filter material at the top of the spray room, it enters the spray room, flows through the workpiece and the operator from top to bottom, and then the exhaust gas containing particulate matter generated in the work is quickly led to the water rotor below the floor grid due to the ...

    • High Quality Heating Room Suppliers –  Environmental protection auto professional paint room-s-700 – Jinming

      High Quality Heating Room Suppliers – E...

      Description of the main structure of the spray paint room The paint room is composed of chamber body, lighting device, air filtration system, air supply system, exhaust system, paint mist treatment system, electric control system, safety protection device and so on. The chamber body Paint chamber chamber body is fully closed structure, mainly composed of wall panels, workpiece entry, pedestrian safety door and bottom grille. Chamber body strength, stability, impact resistance, shoc...