• banner

High Quality Equipment For Painting Cars Supplier – Passenger car professional rain test test room JM-900 – Jinming

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We're going to commit ourselves to giving our esteemed buyers using the most enthusiastically considerate solutions for Vortex Dust Collector, Wynn Dust Collector Filter, Heat Exchanger, we could solve our customer problems asap and do the profit for our customer. If you need good service and quality , pls choose us , thanks !
High Quality Equipment For Painting Cars Supplier – Passenger car professional rain test test room JM-900 – Jinming Detail:

Introduction

The equipment is used for the vehicle sealing inspection, rain, dry room for through type. The water is continuously pumped into the main pipeline from the reservoir, through pressure regulation and flow regulation into the rain pipeline, shot to the surface of the car body through the nozzle, the ejected water is collected into the reservoir, after precipitation filtration, recycling. During the inspection, all doors and Windows are closed, and the driver drives the car in and passes through the rain chamber and the blow-drying chamber in turn. The rain duration is adjustable from 3-15min. Vehicle rain test requirements of the top, before and after, around and at the bottom, rain, dry in the indoor, rain laboratory, dry chamber body with stainless steel plate, the surface of the chamber body is stainless steel plate material, the outer surface is anti-rust coating, rain chamber, dry chamber import and export do not set a closed door. The rain and blow-drying room is mainly composed of rain room, blow-drying room, circulating reservoir, water supply system of pump, backwater system, filtration system, rain system (nozzle can be replaced), blow-drying system and electronic control system.

Operation button set manual and automatic operation, can be manually forced water pump and fan work.

Rain zone: spray the body surface with a certain intensity of rain. At the same time, the sewage treatment device is set up to filter the circulating water and make it reach the standard of circulating water.

Vehicle rain test room L-900-2
Vehicle rain test room L-900-3
Vehicle rain test room L-900-1

Rain seal test by induction switch control rain, rain time can be set delay.

The flow of the rain piping system is adjustable, and the outlet pressure of the pump is adjustable. The rain system adopts circulating water, with filtration (stainless steel filter, to ensure that no sand with the flow of water spray injured body paint), drainage function. There are ditches on the road in the whole test area that are communicated with the rainwater chamber reservoir. The road slopes to the center line about 2° on both sides (high on both sides and low in the middle). The water flowing from the car body flows to the ditch from the ground and then returns to the rainwater chamber reservoir.

Used for vehicle rain test, other models support customization.


Product detail pictures:

High Quality Equipment For Painting Cars Supplier –  Passenger car professional rain test test room JM-900 – Jinming detail pictures


Related Product Guide:

To constantly improve the management system by virtue of the rule of "sincerely, good faith and quality are the base of enterprise development", we widely absorb the essence of related products internationally, and constantly develop new products to meet the demands of customers for High Quality Equipment For Painting Cars Supplier – Passenger car professional rain test test room JM-900 – Jinming , The product will supply to all over the world, such as: Brasilia, Estonia, Sudan, We focus on providing service for our clients as a key element in strengthening our long-term relationships. Our continual availability of high grade products in combination with our excellent pre-sale and after-sales service ensures strong competitiveness in an increasingly globalized market. We are willing to cooperate with business friends from at home and abroad and create a great future together.
  • Staff is skilled, well-equipped, process is specification, products meet the requirements and delivery is guaranteed, a best partner!
    5 Stars By Ada from United States - 2018.06.28 19:27
    Products and services are very good, our leader is very satisfied with this procurement, it is better than we expected,
    5 Stars By Klemen Hrovat from Egypt - 2018.10.09 19:07
    Write your message here and send it to us

    Related products

    • Iron Phosphate Pretreatment Exporters –  Water rotary spray paint roomS-1600 – Jinming

      Iron Phosphate Pretreatment Exporters – ...

      Introduction Water spray paint room, also known as Wenshi spray paint room, is to solve the water circulation system of the original water spray paint room often blocked. After the outdoor air is purified by the filter material at the top of the spray room, it enters the spray room, flows through the workpiece and the operator from top to bottom, and then the exhaust gas containing particulate matter generated in the work is quickly led to the water rotor below the floor grid due to the ...

    • Pre-Treatment Equipment Exporters –  Water rotary spray paint roomS-1600 – Jinming

      Pre-Treatment Equipment Exporters – Wat...

      Introduction Water spray paint room, also known as Wenshi spray paint room, is to solve the water circulation system of the original water spray paint room often blocked. After the outdoor air is purified by the filter material at the top of the spray room, it enters the spray room, flows through the workpiece and the operator from top to bottom, and then the exhaust gas containing particulate matter generated in the work is quickly led to the water rotor below the floor grid due to the ...

    • Pro Line Marine Finishes Factory –  Auto automatic robot paint room – Jinming

      Pro Line Marine Finishes Factory – Auto...

      Introduction According to the properties of coating production, it can be divided into intermittent production and continuous production. Intermittent production spray room is mainly used for single or small batch of workpiece painting operation, can also be used for large batch of small workpiece painting operation. Its form according to the workpiece placement way has the table, the suspension type, the table mobile three. Intermittent production of spray room for semi-open, continuous...

    • High Quality Air Spray System –  Environmental protection auto professional paint room-s-700 – Jinming

      High Quality Air Spray System – Environ...

      Description of the main structure of the spray paint room The paint room is composed of chamber body, lighting device, air filtration system, air supply system, exhaust system, paint mist treatment system, electric control system, safety protection device and so on. The chamber body Paint chamber chamber body is fully closed structure, mainly composed of wall panels, workpiece entry, pedestrian safety door and bottom grille. Chamber body strength, stability, impact resistance, shoc...

    • China Check The Location Exporters –  Passenger car professional rain test test room JM-900 – Jinming

      China Check The Location Exporters – Pa...

      Introduction The equipment is used for the vehicle sealing inspection, rain, dry room for through type. The water is continuously pumped into the main pipeline from the reservoir, through pressure regulation and flow regulation into the rain pipeline, shot to the surface of the car body through the nozzle, the ejected water is collected into the reservoir, after precipitation filtration, recycling. During the inspection, all doors and Windows are closed, and the driver drives the car in ...

    • China Downlight Dust Catcher Factories –  RTO regenerative waste gas incinerator – Jinming

      China Downlight Dust Catcher Factories – ...

      Introduction RT0 is also known as regenerative heating garbage incinerator, is a kind of environmental protection machinery that depends on heat energy to immediately ignite the waste gas, which can solve the waste gas in spraying, painting, packaging and printing, plastics, chemical plants, electrophoresis principle, spraying, electronic devices and other basically all fields. For the waste gas with the concentration value in the range of 100-3500mg /m3, RTO has the practical effect tha...