• banner

Drying Equipment Supplier – Room of the lacquer that bake – Jinming

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

To create much more price for clients is our company philosophy; purchaser growing is our working chase for Integrated Equipment Of Galvanized Dry-Type Filtering Uv Photocatalytic Active Carbon, Cyclone Spray Tower, Spray Painting Equipment Suppliers, We welcome shoppers, business enterprise associations and close friends from all sections with the globe to contact us and seek cooperation for mutual added benefits.
Drying Equipment Supplier – Room of the lacquer that bake – Jinming Detail:

It is mainly composed of chamber body, heat exchange device, heat circulation air duct, exhaust air duct and flue gas emission system.

Drying room is designed with electric door, the workpiece into the furnace, electric door closed. The heating unit is placed on the steel platform at the top of the chamber.

Structure description

The equipment is mainly composed of chamber body, indoor circulating air duct, electric gate, heating unit, smoke exhaust device and other parts.

Chamber structure

The chamber body adopts square tube as steel frame structure. The inner wall of the chamber is made of 1.5mm aluminized plate and 0.5mm galvanized corrugated plate, and the middle is filled with 150 thick rock wool insulation layer (rock wool weight 80-100kg /m3). The overall appearance is beautiful and the heat preservation effect is good. At the same time with expansion section, to ensure the drying room thermal expansion and cold contraction needs.

Indoor air duct

The chamber body of drying furnace adopts convection heating and adopts the structure of lower air supply and upper air return.

The hot air in the heating section enters the inner cavity and is sent to the drying passage through the air supply pipe. The return air adopts adjustable air plate to balance the air volume and pressure. The chamber body insulation section adopts uniform flow air supply structure, after passing through the filter, into the passage, the return air structure is the same as the heating section return air structure. The air duct of drying furnace is made of 1.2mm aluminized plate.

A temperature sensor is arranged on the top of the side of the chamber to detect the temperature of each working area in the room.

External air duct

The hot air circulation duct is connected with the drying room and the heat exchanger, and a temperature sensor is arranged on the circulation air road, which is used to detect the air temperature of the air supply and return ports of the drying room. The material of air duct is the same as that of indoor air duct. The exhaust gas is extracted from the drying chamber by the exhaust fan and fed into the incinerator, and discharged to the atmosphere through the heat exchanger.

Heating device

The heating device is composed of natural gas combustion unit, exhaust air diversion device, heating pipeline and chimney.
■ Natural gas combustion units
It consists of automatic ignition device, regulating valve, pipeline and so on.
■ combustion furnace
1. By the combustion chamber, burner, heat exchanger, high temperature filter, insulation layer, shell, saddle, etc. The outer part of the incinerator end is provided with: high pressure ignition coil, flame detector, flame peeper and compressed air cooling device, combustor pressure monitoring (differential pressure meter), leak detection alarm.
The burner adopts double – stage fire burner.
δ3mmSUS304 steel plate is used in the combustion chamber and δ2mm SUS304 steel plate is used in the heat exchanger.
2. The drying furnace heating system does not have waste gas incineration device, and the waste gas is introduced into the professional waste gas treatment device. The heating device adopts centralized heat exchange, filtration and circulation fan as the whole four-element device, and the centrifugal fan is high-temperature resistant embedded type. Fresh air and final incineration gas are heated and sent to the entrance and exit of the drying room.
3. The structure design of the combustion chamber and heat exchanger has the degree of freedom of thermal expansion, and a temperature sensor is arranged on the cylinder body of the combustion chamber. The heating pipeline is composed of high temperature air duct, heat resistant steel bellows expansion joint, sliding air duct hanger, linkage electric air valve and temperature and pressure monitoring device.
4. High temperature air duct adopts heat resistant steel plate sealing welding structure, segmented manufacturing and installation; Except for the parts considered for maintenance, the rest of the air duct flange interface adopts sealing welding, and the sealing material used in the flange connection surface of the maintenance part shall be resistant to high temperature aging.
5. The chimney will exhaust the oven exhaust gas and flue gas to a position 3m higher than any air intake on the roof of the factory (the specific height meets the requirements of environmental protection). The bottom of the chimney shall be provided with a pipe for discharging rainwater.

burner1
heat exchanger1
Ternary heater

Smoke exhaust device

The inlet and outlet of the chamber body is equipped with a smoke exhaust hood to prevent hot air leakage when the workpiece is in and out, affecting the workshop environment. The smoke exhaust fan adopts high-temperature axial flow fan, the smoke exhaust hood is made of 1.2 thick galvanized sheet, and the height of the exhaust pipe is 15 meters (out of the roof).

Steel platform

The repair room is provided with a steel platform on the upper part of the chamber body, where heating unit and air curtain device are placed. The steel platform is made of profile welding, and the platform is provided with a maintenance ladder.
Used for all kinds of workpiece painting, other models can be customized.


Product detail pictures:

Drying Equipment Supplier –  Room of the lacquer that bake – Jinming detail pictures


Related Product Guide:

We normally believe that one's character decides products' quality, the details decides products' high-quality ,while using the REALISTIC,EFFICIENT AND INNOVATIVE staff spirit for Drying Equipment Supplier – Room of the lacquer that bake – Jinming , The product will supply to all over the world, such as: Colombia, New Orleans, Sydney, We always adhere to follow the honesty, mutual benefit, common development, after years of development and the tireless efforts of all staff, now has perfect export system, diversified logistics solutions, thorough meet customer shipping, air transport, international express and logistics services. Elaborate one-stop sourcing platform for our customers!
  • In China, we have purchased many times, this time is the most successful and most satisfactory, a sincere and realiable Chinese manufacturer!
    5 Stars By Elsie from Norway - 2017.09.28 18:29
    This company can be well to meet our needs on product quantity and delivery time, so we always choose them when we have procurement requirements.
    5 Stars By Phoenix from Zambia - 2017.12.09 14:01
    Write your message here and send it to us

    Related products

    • China Water Spray Paint Suppliers –  Dusting paint painting production line – Jinming

      China Water Spray Paint Suppliers – Dus...

      Introduction Coating production line mainly by pretreatment electrophoresis line (electrophoretic paint is the earliest developed water-based coating, its main characteristics are high coating efficiency, economic safety, less pollution, can achieve complete automation management. Pretreatment is required before coating electrophoretic paint), sealing bottom coating line, middle coating line, surface coating line, finishing line and its drying system. The whole conveying system of the pa...

    • China Coating Equipment Factories –  Passenger car professional rain test test room JM-900 – Jinming

      China Coating Equipment Factories – Pas...

      Introduction The equipment is used for the vehicle sealing inspection, rain, dry room for through type. The water is continuously pumped into the main pipeline from the reservoir, through pressure regulation and flow regulation into the rain pipeline, shot to the surface of the car body through the nozzle, the ejected water is collected into the reservoir, after precipitation filtration, recycling. During the inspection, all doors and Windows are closed, and the driver drives the car in ...

    • China Portable Dust Extraction Systems Factories –  Filter cartridge bag dust collector – Jinming

      China Portable Dust Extraction Systems Factorie...

      Introduction PL series single machine dust removal equipment is the domestic more dust removal equipment, the equipment by fan, filter type filter, dust collector trinity. The filter barrel of the PL single-machine bag filter is made of imported polyester fiber, which has many advantages such as high dust removal efficiency, fine dust collection, small size, convenient installation and maintenance, long service life and so on. PL series single machine dust collector in the equipment...

    • High Quality Dust Extraction System Factories –  Whirlwind dust separator F-300 – Jinming

      High Quality Dust Extraction System Factories &...

      Introduction Cyclone dust collector is a kind of dust removal device. The dedusting mechanism is to make the dust-bearing air flow rotate, the dust particles are separated from the air flow by centrifugal force and collected on the wall of the device, and then the dust particles fall into the dust hopper by gravity. Each component of cyclone dust collector has a certain size proportion, and the change of each proportion relation can affect the efficiency and pressure loss of cyclone dust...

    • High Quality Painting Equipment And Supplies Exporters –  Integral mobile spray paint room – Jinming

      High Quality Painting Equipment And Supplies Ex...

      The chamber body The chamber body is composed of skeleton, wall panel, electric rolling curtain door, lighting system, safety side door and other parts. The chamber body is through type, the whole chamber body skeleton structure is welded into one, forming a steel frame structure, and through anti-rust treatment; The chamber wall panel is assembled structure, all the panels are made of 1.2mm galvanized sheet folding assembly; The wrapping Angle is the whole galvanized sheet bending formi...

    • China Chemical Method Supplier –  Zeolite wheel adsorption concentration – Jinming

      China Chemical Method Supplier – Zeolit...

      Basic principles The basic principle of zeolite wheel structure  The concentration zone of zeolite runner can be divided into treatment zone, regeneration zone and cooling zone. The concentration runner runs continuously in each zone. VOC organic exhaust gas passes through the pre-filter and through the treatment area of the concentrator runner unit. In the treatment area, VOCs are removed by adsorbent adsorption, and the purified air is discharged from the treatment range of the co...