• banner

China Coating Equipment Factories – Passenger car professional rain test test room JM-900 – Jinming

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

All we do is always associated with our tenet " Customer first, Trust first, devoting on the food packaging and environmental protection for Coating Equipment, Compact Dust Collector, Surface Treatment, And we can help looking for any products of the customers' needs. Make sure provide the best Service, the Best Quality, The fast Delivery.
China Coating Equipment Factories – Passenger car professional rain test test room JM-900 – Jinming Detail:

Introduction

The equipment is used for the vehicle sealing inspection, rain, dry room for through type. The water is continuously pumped into the main pipeline from the reservoir, through pressure regulation and flow regulation into the rain pipeline, shot to the surface of the car body through the nozzle, the ejected water is collected into the reservoir, after precipitation filtration, recycling. During the inspection, all doors and Windows are closed, and the driver drives the car in and passes through the rain chamber and the blow-drying chamber in turn. The rain duration is adjustable from 3-15min. Vehicle rain test requirements of the top, before and after, around and at the bottom, rain, dry in the indoor, rain laboratory, dry chamber body with stainless steel plate, the surface of the chamber body is stainless steel plate material, the outer surface is anti-rust coating, rain chamber, dry chamber import and export do not set a closed door. The rain and blow-drying room is mainly composed of rain room, blow-drying room, circulating reservoir, water supply system of pump, backwater system, filtration system, rain system (nozzle can be replaced), blow-drying system and electronic control system.

Operation button set manual and automatic operation, can be manually forced water pump and fan work.

Rain zone: spray the body surface with a certain intensity of rain. At the same time, the sewage treatment device is set up to filter the circulating water and make it reach the standard of circulating water.

Vehicle rain test room L-900-2
Vehicle rain test room L-900-3
Vehicle rain test room L-900-1

Rain seal test by induction switch control rain, rain time can be set delay.

The flow of the rain piping system is adjustable, and the outlet pressure of the pump is adjustable. The rain system adopts circulating water, with filtration (stainless steel filter, to ensure that no sand with the flow of water spray injured body paint), drainage function. There are ditches on the road in the whole test area that are communicated with the rainwater chamber reservoir. The road slopes to the center line about 2° on both sides (high on both sides and low in the middle). The water flowing from the car body flows to the ditch from the ground and then returns to the rainwater chamber reservoir.

Used for vehicle rain test, other models support customization.


Product detail pictures:

China Coating Equipment Factories –  Passenger car professional rain test test room JM-900 – Jinming detail pictures


Related Product Guide:

Our business has been focusing on brand strategy. Customers' pleasure is our best advertising. We also offer OEM company for China Coating Equipment Factories – Passenger car professional rain test test room JM-900 – Jinming , The product will supply to all over the world, such as: Accra, New Delhi, Miami, With the growing of the company, now our products sold and served at more than 15 countries around the world,such as Europe,North America,Middle-east,South America,Southern Asia and so on. As we bear in our mind that innovation is essential to our growth, new product development is constantly.Besides, Our flexible and efficient operation strategies,High quality products and competitive prices are exactly what our customers are looking for. Also a considerable service brings us good credit reputation.
  • The company leader recept us warmly, through a meticulous and thorough discussion, we signed a purchase order. Hope to cooperate smoothly
    5 Stars By Arthur from Sheffield - 2017.05.21 12:31
    As a veteran of this industry, we can say that the company can be a leader in the industry, select them is right.
    5 Stars By Marcia from Atlanta - 2018.06.12 16:22
    Write your message here and send it to us

    Related products

    • High Quality Concrete Water Tank Coating Exporters –  Auto automatic robot paint room – Jinming

      High Quality Concrete Water Tank Coating Export...

      Introduction According to the properties of coating production, it can be divided into intermittent production and continuous production. Intermittent production spray room is mainly used for single or small batch of workpiece painting operation, can also be used for large batch of small workpiece painting operation. Its form according to the workpiece placement way has the table, the suspension type, the table mobile three. Intermittent production of spray room for semi-open, continuous...

    • China Air Spray System Supplier –  Passenger car professional rain test test room JM-900 – Jinming

      China Air Spray System Supplier – Passe...

      Introduction The equipment is used for the vehicle sealing inspection, rain, dry room for through type. The water is continuously pumped into the main pipeline from the reservoir, through pressure regulation and flow regulation into the rain pipeline, shot to the surface of the car body through the nozzle, the ejected water is collected into the reservoir, after precipitation filtration, recycling. During the inspection, all doors and Windows are closed, and the driver drives the car in ...

    • Thermal Spray Powder Suppliers Factories –  Dusting paint painting production line – Jinming

      Thermal Spray Powder Suppliers Factories –...

      Introduction Coating production line mainly by pretreatment electrophoresis line (electrophoretic paint is the earliest developed water-based coating, its main characteristics are high coating efficiency, economic safety, less pollution, can achieve complete automation management. Pretreatment is required before coating electrophoretic paint), sealing bottom coating line, middle coating line, surface coating line, finishing line and its drying system. The whole conveying system of the pa...

    • Powder Coat Spray Can Exporters –  Integral mobile spray paint room – Jinming

      Powder Coat Spray Can Exporters – Integ...

      The chamber body The chamber body is composed of skeleton, wall panel, electric rolling curtain door, lighting system, safety side door and other parts. The chamber body is through type, the whole chamber body skeleton structure is welded into one, forming a steel frame structure, and through anti-rust treatment; The chamber wall panel is assembled structure, all the panels are made of 1.2mm galvanized sheet folding assembly; The wrapping Angle is the whole galvanized sheet bending formi...

    • China Ceramic Epoxy Coating Factory –  Integral mobile spray paint room – Jinming

      China Ceramic Epoxy Coating Factory – I...

      The chamber body The chamber body is composed of skeleton, wall panel, electric rolling curtain door, lighting system, safety side door and other parts. The chamber body is through type, the whole chamber body skeleton structure is welded into one, forming a steel frame structure, and through anti-rust treatment; The chamber wall panel is assembled structure, all the panels are made of 1.2mm galvanized sheet folding assembly; The wrapping Angle is the whole galvanized sheet bending formi...

    • High Quality Powder Coating Equipment Factory –  Auto automatic robot paint room – Jinming

      High Quality Powder Coating Equipment Factory &...

      Introduction According to the properties of coating production, it can be divided into intermittent production and continuous production. Intermittent production spray room is mainly used for single or small batch of workpiece painting operation, can also be used for large batch of small workpiece painting operation. Its form according to the workpiece placement way has the table, the suspension type, the table mobile three. Intermittent production of spray room for semi-open, continuous...