• banner

China accumulator car – Passenger car professional rain test test room JM-900 – Jinming

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Bear "Customer first, Quality first" in mind, we work closely with our customers and provide them with efficient and professional services for Air Spray Painting Equipment, Spray Typ Pretreatment Production Line, Electrophoretic Coating Line, At our firm with quality first as our motto, we manufacture products that are entirely made in Japan, from materials procurement to processing. This enables them to be used with confident peace of mind.
China accumulator car – Passenger car professional rain test test room JM-900 – Jinming Detail:

Introduction

The equipment is used for the vehicle sealing inspection, rain, dry room for through type. The water is continuously pumped into the main pipeline from the reservoir, through pressure regulation and flow regulation into the rain pipeline, shot to the surface of the car body through the nozzle, the ejected water is collected into the reservoir, after precipitation filtration, recycling. During the inspection, all doors and Windows are closed, and the driver drives the car in and passes through the rain chamber and the blow-drying chamber in turn. The rain duration is adjustable from 3-15min. Vehicle rain test requirements of the top, before and after, around and at the bottom, rain, dry in the indoor, rain laboratory, dry chamber body with stainless steel plate, the surface of the chamber body is stainless steel plate material, the outer surface is anti-rust coating, rain chamber, dry chamber import and export do not set a closed door. The rain and blow-drying room is mainly composed of rain room, blow-drying room, circulating reservoir, water supply system of pump, backwater system, filtration system, rain system (nozzle can be replaced), blow-drying system and electronic control system.

Operation button set manual and automatic operation, can be manually forced water pump and fan work.

Rain zone: spray the body surface with a certain intensity of rain. At the same time, the sewage treatment device is set up to filter the circulating water and make it reach the standard of circulating water.

Vehicle rain test room L-900-2
Vehicle rain test room L-900-3
Vehicle rain test room L-900-1

Rain seal test by induction switch control rain, rain time can be set delay.

The flow of the rain piping system is adjustable, and the outlet pressure of the pump is adjustable. The rain system adopts circulating water, with filtration (stainless steel filter, to ensure that no sand with the flow of water spray injured body paint), drainage function. There are ditches on the road in the whole test area that are communicated with the rainwater chamber reservoir. The road slopes to the center line about 2° on both sides (high on both sides and low in the middle). The water flowing from the car body flows to the ditch from the ground and then returns to the rainwater chamber reservoir.

Used for vehicle rain test, other models support customization.


Product detail pictures:

China accumulator car –  Passenger car professional rain test test room JM-900 – Jinming detail pictures


Related Product Guide:

We are also focusing on enhancing the things administration and QC program in order that we could keep fantastic advantage within the fiercely-competitive enterprise for China accumulator car – Passenger car professional rain test test room JM-900 – Jinming , The product will supply to all over the world, such as: Lyon, Greenland, Montreal, We have established long-term, stable and good business relationships with many manufacturers and wholesalers around the world. Currently, we are looking forward to even greater cooperation with overseas customers based on mutual benefits. Please feel free to contact us for more details.
  • The company's products very well, we have purchased and cooperated many times, fair price and assured quality, in short, this is a trustworthy company!
    5 Stars By Princess from Jersey - 2017.07.28 15:46
    This is a honest and trustworthy company, technology and equipment are very advanced and the prodduct is very adequate, there is no worry in the suppliment.
    5 Stars By Mandy from venezuela - 2018.12.10 19:03
    Write your message here and send it to us

    Related products

    • China Car Painting Equipment –  Water rotary spray paint roomS-1600 – Jinming

      China Car Painting Equipment – Water ro...

      Introduction Water spray paint room, also known as Wenshi spray paint room, is to solve the water circulation system of the original water spray paint room often blocked. After the outdoor air is purified by the filter material at the top of the spray room, it enters the spray room, flows through the workpiece and the operator from top to bottom, and then the exhaust gas containing particulate matter generated in the work is quickly led to the water rotor below the floor grid due to the ...

    • Static Dust Collector Factories –  Activated carbon adsorption, desorption, catalytic combustion – Jinming

      Static Dust Collector Factories – Activ...

      Introduction Workshop is engaged in the production operation will poduce the harmful gas such as stimulation of pollutants, to nature ecology and plant environmental hazards can cause air pollution, waste gas emissions from the equipment will be collected, the use of activated carbon adsorption tower will be treated as waste gas to the air pollutant emission standards before discharge into the atmosphere, so as not to ause the harm of environment and staff. Activated carbon abs...

    • Line Powder Coating Factory –  Environmental protection auto professional paint room-s-700 – Jinming

      Line Powder Coating Factory – Environme...

      Description of the main structure of the spray paint room The paint room is composed of chamber body, lighting device, air filtration system, air supply system, exhaust system, paint mist treatment system, electric control system, safety protection device and so on. The chamber body Paint chamber chamber body is fully closed structure, mainly composed of wall panels, workpiece entry, pedestrian safety door and bottom grille. Chamber body strength, stability, impact resistance, shoc...

    • High Quality Portable Industrial Dust Collection System Factories –  Zeolite wheel adsorption concentration – Jinming

      High Quality Portable Industrial Dust Collectio...

      Basic principles The basic principle of zeolite wheel structure  The concentration zone of zeolite runner can be divided into treatment zone, regeneration zone and cooling zone. The concentration runner runs continuously in each zone. VOC organic exhaust gas passes through the pre-filter and through the treatment area of the concentrator runner unit. In the treatment area, VOCs are removed by adsorbent adsorption, and the purified air is discharged from the treatment range of the co...

    • High Quality Dust Control Filter –  Zeolite wheel adsorption concentration – Jinming

      High Quality Dust Control Filter – Zeol...

      Basic principles The basic principle of zeolite wheel structure  The concentration zone of zeolite runner can be divided into treatment zone, regeneration zone and cooling zone. The concentration runner runs continuously in each zone. VOC organic exhaust gas passes through the pre-filter and through the treatment area of the concentrator runner unit. In the treatment area, VOCs are removed by adsorbent adsorption, and the purified air is discharged from the treatment range of the co...

    • China Water Tank Coating –  Water rotary spray paint roomS-1600 – Jinming

      China Water Tank Coating – Water rotary...

      Introduction Water spray paint room, also known as Wenshi spray paint room, is to solve the water circulation system of the original water spray paint room often blocked. After the outdoor air is purified by the filter material at the top of the spray room, it enters the spray room, flows through the workpiece and the operator from top to bottom, and then the exhaust gas containing particulate matter generated in the work is quickly led to the water rotor below the floor grid due to the ...